Requirements for the Building
Basic prerequisite is the Efficiency House-40 standard: The annual primary energy demand amounts to a maximum of 40 % of the reference building, and the transmission heat loss clearly falls below the legal requirements. For all KFN projects, a proof of the greenhouse gas emissions over the entire life cycle must also be provided (Quelle: kfw.de, Programme 297/298, Stand 2026).
For the higher funding level 298, the building must additionally receive the QNG seal („Qualitätssiegel Nachhaltiges Gebäude“). This is associated with stricter greenhouse gas limit values over the life cycle as well as further sustainability criteria. Which detailed requirements an EH 40 meets is set out on the page Requirements out.
Application Route via the House Bank
KFN applications are submitted via a financing partner, not directly with the KfW. The process in brief: (1) obtain an offer from a funding-eligible manufacturer and prepare the EH-40 proof, (2) involve energy efficiency experts who issue the confirmation for the application (BzA), (3) submit the application via the house bank prior to project start, (4) sign the construction contract after approval. If the contract is concluded first, the project is considered started and the application is rejected (Quelle: kfw.de, Stand 2026). The complete process is described on the page Process.